---
title: "WBS - Project Work Breakdown - Reviews, Revenue and Downloads in United States | Apple App Store"
description: "Manage the work breakdown structure (WBS) in the list and tree diagram. Construct the work package tree and update the estimate; import work items from MS Excel and export the work breakdown structure"
---

# WBS - Project Work Breakdown — United States
> Cost Budget Forecast Estimate

![WBS App Icon](https://is1-ssl.mzstatic.com/image/thumb/Purple126/v4/49/60/2e/49602e67-8411-6343-d5c2-70ed7cd3108c/AppIcons-0-0-1x_U007emarketing-0-0-0-10-0-0-sRGB-0-0-0-GLES2_U002c0-512MB-85-220-0-0.png/434x0w.png)

**Developer:** [皓 李](https://apptail.io/developer/developer-RWB)
**Category:** Business
**Rating:** 4.7/5 (147 ratings)
**Price:** Free
**Bundle ID:** com.mobilinked.wbs
**Store:** Apple App Store
**Country:** United States
**Version:** 6.5 (released 2023-04-23)
**Original Release:** 2014-05-24

**App Store Link:** [Download on Apple App Store](https://apps.apple.com/us/app/app/id879291053)
**AppTail Page:** [https://apptail.io/app/wbs-project-work-breakdown-tsul/united-states](https://apptail.io/app/wbs-project-work-breakdown-tsul/united-states)

## WBS Description
Manage the work breakdown structure (WBS) in the list and tree diagram. Construct the work package tree and update the estimate; import work items from MS Excel and export the work breakdown structure to PDF, Excel, and image files. Also, we can convert a work breakdown structure to a project plan file in the QuickPlan app.

The WBS is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. It is a tree structure that shows a breakdown of the effort required to achieve a goal, such as a program, a project, and a contract.

Mobilinked WBS is THE easy-to-use WBS management app for the iPad. Using natural gestures on a clean interface makes WBS management more convenient, faster, and more efficient than ever before. Visualize and simplify the work breakdown structure in the outline and diagram view to break down work elements and determine labor, material, and total costs for each component. The app automatically adds costs up to the element hierarchy, and supports continuous and mass tracking.

The WBS can be exported to image, Excel, and PDF files AND converted to QuickPlan ( as a project plan.

The WBS supports mass entry of work items and import of work items from an MS Excel file.

- Feature video - 
- Support - at 

WBS provides a fast, intuitive and discoverable experience for users in a clean and elegant interface
- Work package maintenance - natural gestures, continuous and batch input in outline and diagram views.
- Project costing - support labor and material costs for work packages Communication - export the work breakdown structure as an image/PDF and Excel file.
- Collaboration - Share the work breakdown structure across multiple devices via email, airdrop, and third-party cloud apps.
- Project plan integration - Export to a project plan for QuickPlan.

FEATURES
- Manage work items in a text outline view and a graphical tree diagram view.
- Continuous and batch entry of work items.
- Import from MS Excel file
- Three chart layouts, AND Display as color or grayscale style.
- Color and icon
- Supports large projects (smooth interaction for 1000 task packages)
- Natural gestures (swipe left/right to adjust outline levels, tap with two fingers to collapse/expand all groups, hold and move to change order).
- Create project quotes with labor and material costs; labor costs can be entered as expenses.
- Adjust project fee rate, currency, and work package category.
- Collapse/expand specific or all groups; zoom in on a chart view.
- User interface customization options
- Share the work breakdown structure with other devices via email, airdrop, and third-party cloud apps.
- Export the outline with costs to a new project plan to QuickPlan (
- Export the entire work breakdown structure or a selected workgroup to an Excel file.
- Export the entire work breakdown structure or a selected workgroup to a PDF file with export customization options.
- Export the entire work breakdown structure or a selected workgroup to an image file.
- Undo and toast with voice output
- Duplicate work breakdown structure

Work breakdown structure makes work planning easy and fast, and helps estimate future project schedule by easily viewing work items and costs. The best project management app for your business on iPad.

## WBS Screenshots
- [Screenshot 1](https://is1-ssl.mzstatic.com/image/thumb/Purple113/v4/7b/97/49/7b974977-3eb4-fbdc-476f-e46e51b7e0e2/mzm.brqwclgz.png/2048x1536.png)
- [Screenshot 2](https://is1-ssl.mzstatic.com/image/thumb/Purple113/v4/48/29/da/4829da09-9da6-1194-ae8d-29b977ea2fc7/mzm.nmfodzth.png/2048x1536.png)
- [Screenshot 3](https://is1-ssl.mzstatic.com/image/thumb/Purple123/v4/56/e8/26/56e826db-0071-ad3f-e835-113e822a511c/mzm.ecflxreq.png/2048x1536.png)
- [Screenshot 4](https://is1-ssl.mzstatic.com/image/thumb/Purple113/v4/a8/81/ab/a881abb4-91c4-e9ba-db50-54cdddcfde1f/mzm.fldclbvf.png/2048x1536.png)
- [Screenshot 5](https://is1-ssl.mzstatic.com/image/thumb/Purple123/v4/29/be/92/29be929f-01cf-31f5-74b2-73d13be94554/mzm.vsaexmjs.png/2048x1536.png)

## WBS Rating Breakdown in United States
- 5 stars: 118 (80%)
- 4 stars: 19 (13%)
- 3 stars: 7 (5%)
- 2 stars: 2 (1%)
- 1 stars: 1 (1%)

## WBS Reviews in United States

### ***** "Um excelente programa"
É um recurso muito bom, apenas deveria ter também em português.
-- Gelson Salvador, 2023-05-21

### ****- "Bottom chopped off on iPad Pro 11” widescreen"
Hello Team,

I’ve just purchased WBS app for iPad and noticed that the bottom of the screen is chopped off on iPad Pro 11” widescreen format when I select an item. The menu on the bottom is chopped off and I’m not able to fully use the app. Please optimize the app for 11” widescreen format and release an update ASAP.

FYI, the new iPad 10.9” is also widescreen and may have similar issue. Also, your other apps may have similar issues with widescreens.

2. It badly needs drag and drop boxes across columns in the layout screen. Currently, it seems deleting and re-adding the boxes is the only way to reorganize.

3. Category is not available for some boxes.

Great app, will give 5 stars on resolving these issues.
-- PowerObject!, 2021-06-07

### ***** "Excellent Program"
This program is a valuable asset to and Project Management Suite.  The program makes creation of a WBS an easy task as it should be.
-- Bullnuke81, 2020-04-29

### ***** "Well Done"
This is a great tool. Almost perfect.  I’d love keyboard shortcuts, but this tool is great!  Keep up the great work developer!
-- Big Voice, 2017-12-06

### ***** "Powerful and Flexible"
A surprisingly powerful tool that supports a robust and dynamic project planning phase. Changes and adjustments are easy to make, budgets are quickly defined, and it has pretty seamless integration with the other apps in the package to create the final plan. Well worth the investment. Paid back the first time.
-- Rick9987, 2017-01-24

### ****- "CEO at UMP"
Pretty good app for me and telling to my team to try it and see if they also like it, it&#039;s something which I do not hesitate to share.
-- Dave Atwal, 2016-05-31

### ****- "What I&#039;ve been looking for"
Compatible with desktop applications, e.g. Excel. Let&#039;s me organize and structure work efforts easily and quickly.
-- The-Gees, 2016-05-17

### ***** "Excellent work breakdown software"
Easy-to-use intuitive interface that is not cluttered with too many bells and whistles.
-- junior mr, 2015-12-08

### ***** "Finally...a great planning app for iPad!"
Organization is the key to success and so many apps fail to have one integrated approach.  This app allows you to completely organize and schedule goals, projects and even mind maps to help you reach your potential.  Great app!
-- AndreJulian, 2015-11-17

### ****- "Outstanding app"
Overall I&#039;m very happy with this app, however I&#039;d like to see more colors for the diagram boxes, that could be with a color picker or more color options.

Please improve that and I&#039;ll update my review.
-- RealTrueBlue, 2015-07-17

[View all WBS reviews and detailed analytics on AppTail](https://app.apptail.io/signup?utm_campaign=ai-crawl&amp;utm_content=reviews)



## WBS Discovered Keywords
- wbs

## Apps Similar to WBS
- [Receipts Pro](https://apptail.io/app/receipts-pro-sYd/united-states)
- [Simulfund * Startup Funding](https://apptail.io/app/simulfund-startup-funding-XER/united-states)
- [MetaCanvas: Business Model Kit](https://apptail.io/app/metacanvas-business-model-kit-xBW/united-states)
- [Нано склад](https://apptail.io/app/nano-sklad-dEic/united-states)
- [inShort](https://apptail.io/app/inshort-pQZd/united-states)
- [Intertek Aware](https://apptail.io/app/intertek-aware-tpsh/united-states)
- [Outliner for iPad](https://apptail.io/app/outliner-for-ipad-hzbl/united-states)
- [Smart Todo - hierarchy task](https://apptail.io/app/smart-todo-hierarchy-task-RbBl/united-states)
- [Job Tracking](https://apptail.io/app/job-tracking-TkTn/united-states)
- [qsomate](https://apptail.io/app/qsomate-clAo/united-states)

## WBS Available In
- [United States](https://apptail.io/app/wbs-project-work-breakdown-tsul/united-states)
- [Mexico](https://apptail.io/app/wbs-project-work-breakdown-tsul/mexico)
- [Brazil](https://apptail.io/app/wbs-project-work-breakdown-tsul/brazil)
- [Canada](https://apptail.io/app/wbs-project-work-breakdown-tsul/canada)
- [Australia](https://apptail.io/app/wbs-project-work-breakdown-tsul/australia)
- [Peru](https://apptail.io/app/wbs-project-work-breakdown-tsul/peru)
- [South Africa](https://apptail.io/app/wbs-project-work-breakdown-tsul/south-africa)
- [Chile](https://apptail.io/app/wbs-project-work-breakdown-tsul/chile)
- [Colombia](https://apptail.io/app/wbs-project-work-breakdown-tsul/colombia)
- [Spain](https://apptail.io/app/wbs-project-work-breakdown-tsul/spain)
- [Denmark](https://apptail.io/app/wbs-project-work-breakdown-tsul/denmark)
- [Vietnam](https://apptail.io/app/wbs-project-work-breakdown-tsul/vietnam)
- [Norway](https://apptail.io/app/wbs-project-work-breakdown-tsul/norway)
- [Austria](https://apptail.io/app/wbs-project-work-breakdown-tsul/austria)
- [New Zealand](https://apptail.io/app/wbs-project-work-breakdown-tsul/new-zealand)
- [Russia](https://apptail.io/app/wbs-project-work-breakdown-tsul/russia)
- [Türkiye](https://apptail.io/app/wbs-project-work-breakdown-tsul/turkey)
- [Sweden](https://apptail.io/app/wbs-project-work-breakdown-tsul/sweden)
- [India](https://apptail.io/app/wbs-project-work-breakdown-tsul/india)
- [Ireland](https://apptail.io/app/wbs-project-work-breakdown-tsul/ireland)
- [Argentina](https://apptail.io/app/wbs-project-work-breakdown-tsul/argentina)
- [Poland](https://apptail.io/app/wbs-project-work-breakdown-tsul/poland)
- [Romania](https://apptail.io/app/wbs-project-work-breakdown-tsul/romania)
- [Finland](https://apptail.io/app/wbs-project-work-breakdown-tsul/finland)
- [Ecuador](https://apptail.io/app/wbs-project-work-breakdown-tsul/ecuador)
- [Ukraine](https://apptail.io/app/wbs-project-work-breakdown-tsul/ukraine)
- [Czechia](https://apptail.io/app/wbs-project-work-breakdown-tsul/czechia)
- [Portugal](https://apptail.io/app/wbs-project-work-breakdown-tsul/portugal)
- [Algeria](https://apptail.io/app/wbs-project-work-breakdown-tsul/algeria)
- [Israel](https://apptail.io/app/wbs-project-work-breakdown-tsul/israel)
- [Saudi Arabia](https://apptail.io/app/wbs-project-work-breakdown-tsul/saudi-arabia)
- [Azerbaijan](https://apptail.io/app/wbs-project-work-breakdown-tsul/azerbaijan)

---

## About AppTail

[AppTail](https://apptail.io) is a mobile app intelligence platform providing app analytics, ASO (App Store Optimization) tools, keyword tracking, competitor analysis, revenue estimates, and review monitoring for iOS App Store apps. Track your app's performance, discover ranking keywords, monitor competitors, and analyze market trends.

- [Search Apps](https://apptail.io)
- [Top Charts](https://apptail.io/top-iphone-apps)
- [Sign Up for Full Access](https://app.apptail.io/signup?utm_campaign=ai-crawl&amp;utm_content=footer)

*Data provided by [AppTail](https://apptail.io) - Mobile App Intelligence Platform*
