Nama water app
SMRs. Date on bill of reading by Nama 30 or 31 Condition for SMR to be accepted 28to 30 days. Readings are only accepted between 5th to 25th. So its not possible to load SMRs as will not accept on 28th of the month. It makes no sense. Last bill Nov readings although written as regular was for sure an estimate. I checked my meters. Please correct the period that SMRs will be accepted if NAMA really wants customers to load actual readings and avoid estimates